Ohariu Valley

Passive House Plus Wellington Project

Floor Area: 254m2

Flexi House provided specialist offsite design and design for manufacture and assembly (DfMA) support to enable this project to be built offsite in collaboration with Frank House Panels.

- UNDER CONSTRUCTION -

    • Manufacture: 9 weeks, Apr-Jun 2025

    • Site Assembly: Target of 2 weeks

    • Completion: 3 months

    • Passive House Plus

    • Insulation - R4.1 Wall & R7.9 & R6.6 Roof

    • ECO Windows Timber WOODALU PR78 Tripple Glazed Windows & Doors

    • Pro Clima Intello Airtightness & Vapour Control

    • Plywood Rigid Air Barrier with Pro Clima Adhearo WRB

    • Ducted Mechanical Ventilation