Ohariu Valley

Passive House Plus Wellington Project

Floor Area: 254m2

Flexi House provided specialist offsite design and design for manufacture and assembly (DfMA) support to enable this project to be built offsite with panels in collaboration with Frank House Panels.

- UNDER CONSTRUCTION -

    • Manufacture: 9 weeks, Apr-Jun 2025

    • Site Assembly: Target of 2 weeks

    • Completion: 3 months

    • Passive House Plus

    • Insulation - R4.1 Wall & R7.9 & R6.6 Roof

    • ECO Windows Timber WOODALU PR78 Tripple Glazed Windows & Doors

    • Pro Clima Intello Airtightness & Vapour Control

    • Plywood Rigid Air Barrier with Pro Clima Adhearo WRB

    • Ducted Mechanical Ventilation